CASE DATE PRODUCT PRODUCT CATEGORY
EBS & Junk Extension saves 12 hours rig time October 18, 2016 Case Study EBS & Junk Extension saves 12 hours rig time www.interwell.com/equalising-balldrop-sub
BVS saves 14 months of workover time October 18, 2016 Case Study BVS saves 14 months of workover time www.interwell.com/barrier-verification-system
BVS first run in UK North Sea October 18, 2016 Case Study BVS first run in UK North Sea www.interwell.com/barrier-verification-system
Modified HEX Tubing Packer with 3M™ Ceramic Sand Screens July 22, 2016 Case Study Modified HEX Tubing Packer with 3M Sand Screens www.interwell.com/high-expansion-retrievable-bridge-plug
Six ME plugs for safe rig approach July 22, 2016 Case Study Six ME plugs for safe rig approach www.interwell.com/medium-expansion-retrievable-bridge-plug
Modified HPHT Set in Oil Based Mud July 22, 2016 Case Study Modified HPHT Set in Oil Based Mud www.interwell.com/hpht-retrievable-bridge-plug
Multi-Run Anchored Production Straddle (APS) with Polished Bore Receptacle (PBR) July 22, 2016 Case Study Multi-Run Anchored Production Straddle (APS) with Polished Bore Receptacle (PBR) www.interwell.com/standard-straddles
Avoiding recompletion with a PBR Straddle July 21, 2016 Case Study Avoiding recompletion with a PBR Straddle www.interwell.com/standard-straddles
Reinstating well integrity with the Anchored Production Straddle May 20, 2016 Case Study Reinstating well integrity with the Anchored Production Straddle www.interwell.com/standard-straddles
Deep-set HEX in Gulf of Mexico February 24, 2016 Case Study Deep-set HEX in GoM www.interwell.com/high-expansion-retrievable-bridge-plug