CASE |
DATE |
PRODUCT |
PRODUCT CATEGORY |
A collaborative approach to maximise recovery and reduce intervention footprint |
March 11, 2022 |
A collaborative approach to maximise recovery and reduce intervention footprint |
Anchored Production Straddle |
Shallow and deep set Inter Remote Bypass Valve successfully operated in a single well |
January 27, 2022 |
Shallow and deep set Inter Remote Bypass Valve successfully operated in a single well |
Inter Remote Bypass Valve |
Optimized Intervention with Interwell Glass barrier device |
January 17, 2022 |
Optimized Intervention with Interwell's Glass barrier device |
Inter Removable Barrier Device - Pump Open |
First Inter Remote Shatter Valve in Asia Pacific Region Successfully Mitigating Risks in Workover Operations |
December 28, 2021 |
First Inter Remote Shatter Valve in Asia Pacific Region Successfully Mitigating Risks in Workover Operations |
Inter Remote Shatter Valve |
Superior Gas Lift Straddle Solution in Collaboration with PTC |
October 15, 2021 |
Superior Gas Lift Straddle Solution in Collaboration with PTC |
Anchored Production Straddle |
Insert Valve Carrier (IVC) with Slips |
October 12, 2021 |
Insert Valve Carrier with Slips |
Insert Valve Carrier |
Multi Product Application Delivers Reliabilities and Efficiencies to Subsea P&A Campaign |
October 06, 2021 |
Multi Product Application Delivers Reliabilities and Efficiencies to Subsea PA Campaign |
High Temperature High Expansion Bridge Plug |
RockSolid™ barrier system is a success |
September 15, 2021 |
RockSolid™ Barrier System is a Success |
Plug & Abandonment |
First in Indonesia Zonal Isolation with High Expansion (HEX) Straddle |
September 10, 2021 |
First in Indonesia, Zonal isolation with High Expansion HEX (Straddle) |
High Expansion Retrievable Bridge Plug |
First Multi Set Wireline Plug with IBV set as shallow well barrier |
August 24, 2021 |
First Multi Set Wireline Plug with IBV set as shallow well barrier |
Intelligent Barrier Valve |
World's first packer integrity remediation to re-establish annulus integrity using E-line Intervention |
August 13, 2021 |
World's first packer integrity remediation to re-establish annulus integrity using E-line Intervention |
Barrier Verification System |
Re-establishing Reservoir Isolation during Deepwater US GoM RLWI with the BVS |
June 28, 2021 |
Re-establishing Reservoir Isolation during Deepwater US GoM RLWI with the BVS |
Barrier Verification System |
Suspension plugs run remotely on E-Line saves over four days Rig Time |
June 09, 2021 |
Suspension Plugs run remotely on E-Line saves over four days Rig Time |
Medium Expansion Bridge Plug |
Electronic Setting Tool Enables Efficient P&A Campaign |
October 21, 2020 |
Electronic Setting Tool Enables Efficient P&A Campaign |
Electronic Setting Tool |
Optimized Completion with Interwell Shatter Glass barrier device |
October 21, 2020 |
Optimized Completion with Interwell Shatter Glass barrier device |
Inter Remote Barrier Device Mechanical Open |
High Expansion Retrievable Bridge Plug (HEX) in Russia, West Siberia |
October 21, 2020 |
High Expansion Retrievable Bridge Plug (HEX) in Russia West Siberia |
High Expansion Retrievable Bridge Plug |
Intervention - less Completion |
October 21, 2020 |
Intervention-less Completion |
Inter Remote Shatter Valve |
Inter Remote Shatter Valve (IRSV) remotely opened after 674 Days |
October 21, 2020 |
Inter Remote Shatter Valve (IRSV) remotely opened after 674 Days |
Inter Remote Shatter Valve |
Retrofitting Insert Valve Carrier prevents expensive workover |
August 26, 2020 |
Retrofitting IVC prevents expensive workover |
Insert Valve Carrier |
Wireless Gauge provides accurate real time downhole data for tubing evaluation and barrier verification |
May 27, 2020 |
Wireless Gauge provides accurate real time downhole data for tubing evaluation and barrier verification |
Barrier Verification System |
Temporary P&A installation with 342-450 Permanent Plug |
April 07, 2020 |
Temporary P&A installation with 342-450 Permanent Plug |
Permanent Plug |
Interwell's Barrier Verification System successfully used for pre-P&A activity |
April 01, 2020 |
Interwell's Barrier Verification System successfully used for pre-P&A activity |
Barrier Verification System |
Pre-P&A with Interwell's Intelligent Barrier Valve |
August 23, 2019 |
Pre-PA with Interwell's Intelligent Barrier Valve |
Intelligent Barrier Valve |
Intervention free Subsea Completion |
July 09, 2019 |
Case Study Intervention free Subsea Completion |
Inter Remote Bypass Valve |
Set Plug to Stim Reservoir Zone with Acid |
June 18, 2018 |
Case Study Set Plug to STim Reservoir Zone with Acid |
High Pressure High Temperature Retrievable Bridge Plug |
Pump Open Sub C/W 342-450 ME Thru Bore RBP |
May 30, 2018 |
Case Study Pump Open Sub CW 342-450 ME Thru Bore RBP |
Pump Open Sub |
Re-Establish Gas Lift using APS to recover stuck in valve |
April 12, 2018 |
Case Study Re-establish Gas Lift using APS to recover stuck valvet |
Standard Straddles |
Shut in Tool C/W Interwell 356-450 Tubing Packer |
December 28, 2017 |
Case Study Shut in Tool CW Interwell 356-450 Tubing Packer |
Shut In Tool |
Well Brought Back Online with APS & Screens |
May 23, 2017 |
Case Study Well Brought Back Online with APS & Screens |
Standard Straddles |
Significant Cost Savings with High Expansion Solution |
April 07, 2017 |
Case Study Significant cost savings with High Expansion solution |
High Expansion Retrievable Bridge Plug |
High Expansion Solution for Horizontal Well |
March 15, 2017 |
Case Study High Expansion Solution for Horizontal Well |
High Expansion Retrievable Bridge Plug |
Custom Multi - Run APS in North Sea |
February 07, 2017 |
Case Study Custom Multi-Run APS in North Sea |
Standard Straddles |
First Global Run of THEX |
January 13, 2017 |
Case Study First Global Run of THEX |
High Temperature High Expansion Bridge Plug |
Bespoke IVC Systems in Australia |
October 18, 2016 |
Case Study Bespoke IVC Systems in Australia |
Insert Valve Carrier |
EBS & Junk Extension saves 12 hours rig time |
October 18, 2016 |
Case Study EBS & Junk Extension saves 12 hours rig time |
Equalising Balldrop Sub |
BVS saves 14 months of workover time |
October 18, 2016 |
Case Study BVS saves 14 months of workover time |
Barrier Verification System |
BVS first run in UK North Sea |
October 18, 2016 |
Case Study BVS first run in UK North Sea |
Barrier Verification System |
Modified HEX Tubing Packer with 3M™ Ceramic Sand Screens |
July 22, 2016 |
Modified HEX Tubing Packer with 3M Sand Screens |
High Expansion Retrievable Bridge Plug |
Six ME plugs for safe rig approach |
July 22, 2016 |
Case Study Six ME plugs for safe rig approach |
Medium Expansion Retrievable Bridge Plug |
Modified HPHT Set in Oil Based Mud |
July 22, 2016 |
Case Study Modified HPHT Set in Oil Based Mud |
High Pressure High Temperature Retrievable Bridge Plug |
Multi-Run Anchored Production Straddle (APS) with Polished Bore Receptacle (PBR) |
July 22, 2016 |
Case Study Multi-Run Anchored Production Straddle (APS) with Polished Bore Receptacle (PBR) |
Standard Straddles |
Avoiding recompletion with a PBR Straddle |
July 21, 2016 |
Case Study Avoiding recompletion with a PBR Straddle |
Standard Straddles |
Reinstating well integrity with the Anchored Production Straddle |
May 20, 2016 |
Case Study Reinstating well integrity with the Anchored Production Straddle |
Standard Straddles |
Deep-set HEX in Gulf of Mexico |
February 24, 2016 |
Deep-set HEX in GoM |
High Expansion Retrievable Bridge Plug |
Velocity String Solution in Holland |
December 17, 2015 |
Case Study VSS in Holland |
Velocity String Solutions |
Multi-run APS |
December 17, 2015 |
Case Study Multi-run APS |
Standard Straddles |
Modified HEX solution in Australia |
December 17, 2015 |
Case Study Modified HEX solution in Australia |
www.interwell.com/high-expansion-retrievable-bridge-plug |
First run Permanent Plug in Australia |
December 17, 2015 |
Case Study First run PP in Australia |
www.interwell.com/permanent-plug |
First run Pump Open Sub in UK |
December 17, 2015 |
Case Study First run POS in UK |
www.interwell.com/pump-open-sub |
First Matrix Installation in North Sea |
December 17, 2015 |
Case Study First Matrix Installation in North Sea |
www.interwell.com/matrix-platform-retrievable-bridge-plug |
Client modified Cement Retainer |
December 17, 2015 |
Case Study Client modified Cement Retainer |
www.interwell.com/cement-retainer-assembly |
12 Hours Rigtime Saved with Equalising Balldrop Sub |
December 17, 2015 |
Case Study 12 Hours Rigtime Saved with Equalising Balldrop Sub |
www.interwell.com/equalising-balldrop-sub |
First run IVC in Middle East |
December 14, 2015 |
Case Study First run IVC in Middle East |
www.interwell.com/ssv-straddles |
Flow Activated Valve (FAV) |
November 17, 2015 |
Case Study FAV |
www.interwell.com/flow-activated-valve |
Expandable Junk Catcher Add-on (EJC-A) |
November 17, 2015 |
Case Study EJC-A |
www.interwell.com/expandable-junk-catcher-add-on |
Application modified HEX |
November 17, 2015 |
Case Study application modified HEX |
www.interwell.com/high-expansion-retrievable-bridge-plug |
High Expansion Bridge Plug in The Middle East |
November 17, 2015 |
Case Study HEX in the Middle East |
www.interwell.com/high-expansion-retrievable-bridge-plug |
Insert Valve Carrier without use of existing safety lock profile |
November 17, 2015 |
Case Study IVC without use of existing safety lock profile |
www.interwell.com/ssv-straddles |
Restoring production with HPHT |
September 15, 2015 |
Case Study Restoring Production with HPHT |
www.interwell.com/hpht-retrievable-bridge-plug |
Barrier Verification System (BVS) |
August 04, 2015 |
Case Study BVS |
www.interwell.com/barrier-verification-system |
Multi Setting Pulling (MSP) Tool |
August 04, 2015 |
Case Study MSP May.2014 |
www.interwell.com/multi-setting-pulling-tool |
Anchored Production Straddle (APS) for Gas-Lift |
July 22, 2015 |
Case Study APS Gas-Lift |
www.interwell.com/standard-straddles |
Velocity String Solution (VSS) |
May 22, 2015 |
Case Study VSS |
www.interwell.com/velocity-string-solutions |
Hex Plugs for new customer in Norway |
March 30, 2015 |
Hex Plugs for new customer in Norway |
www.interwell.com/high-expansion-retrievable-bridge-plug |
Custom made 7" IVC run in damaged safety valve profile |
March 30, 2015 |
Case Study Custom made 7” IVC run in damaged safety valve profile |
www.interwell.com/ssv-straddles |
2 7/8" ME Plug installed for the first time |
March 30, 2015 |
Case Study 2 7-8” ME Plug installed for the first time |
http://www.interwell.com/medium-expansion-retrievable-bridge-plug |
Straddle installation in the Middle East Region |
March 30, 2015 |
Case Study Straddle installation in the Middle East Region |
www.interwell.com/straddle-solutions |
350-700 High Expansion (HEX) Bridge Plug |
March 30, 2015 |
Case Study 350-700 High Expansion (HEX) Bridge Plug |
www.interwell.com/high-expansion-retrievable-bridge-plug |
440-700 High Expansion (HEX) Straddle |
March 30, 2015 |
Case Study 440-700 High Expansion (HEX) Straddle |
www.interwell.com/high-expansion-retrievable-bridge-plug |
Seven Straddles in one well |
March 29, 2015 |
Case Study Seven Straddles in one well |
www.interwell.com/standard-straddles |
Two Gauge Hangers with four Interwell Quartz Gauges, pre-installed in 5 1/2" drill pipe |
March 29, 2015 |
Case Study Two Gauge Hangers with four Quartz Gauges |
www.interwell.com/high-expansion-gauge-hanger |
Successful introduction of our Expandable Junk Catcher (EJC) |
March 29, 2015 |
Case Study Successful introduction of our Expandable Junk Catcher (EJC) |
www.interwell.com/expandable-junk-catcher |
Two multi-run Straddles |
March 29, 2015 |
Case Study Two multi-run Straddles |
www.interwell.com/standard-straddles |
ISO 14310 V-1 qualified ME Cement Retainer |
March 29, 2015 |
Case Study ISO 14310 V-1 qualified ME Cement Retainer |
http://www.interwell.com/cement-retainer-assembly |
First runs performed with the Expandable Junk Catcher add-on (EJC-A) |
March 18, 2015 |
Case Study First runs performed with the Expandable Junk Catcher add-on, EJC-A |
www.interwell.com/expandable-junk-catcher-add-on |
Multi Setting Pulling (MSP) Tool |
March 18, 2015 |
Case Study MSP |
http://www.interwell.com/multi-setting-pulling-tool |