High Pressure High Temperature Retrievable Bridge Plug
The patented HPHT contains an innovative seal module which both compresses and constrains the element, enabling it to withstand extreme differential pressures.
This product can be used in:
The Product
The HTHP
The patented HPHT retrievable bridge plug contains an innovative seal module which both compresses and constrains the element, enabling it to withstand extreme differential pressures. The slim design eases the deployment and retrieval through narrow wellbore restrictions, a crucial operational benefit.
Technology
The HPHT bridge plug can be used as a temporary or permanent barrier. The element and slip modules have been designed to withstand bi-directional pressure which allows the plug to be set in cross flow. Ideal for workover applications: well control barrier, packer for injection valve, fixed choke etc. It can be run as an isolation plug or a packer, and can incorporate junk extensions and/or equalizing devices.
Key Benefits
- Other sizes available on request
- Can be run on slickline, e-line, coiled tubing and pipe
- Equalize and retrieve with standard GS in a single operation (no prong required)
- Slim design eases the deployment and retrieval through narrow wellbore restrictions
- Tested to differential pressures up to 861 bar (12,500 psi)*at temperatures up to 220 °C (428 °F)*
- Qualified in accordance with the ISO 14310:2008 international standard up to validation grade V0
- Element and slip modules withstand bi-directional pressure allowing the plug to be set in cross flow
- Innovative seal module compresses and constrains the element, enabling it to withstand extreme differential pressures
*Applies to some sizes, please contact us for more details
Download Product Sheet
Adaptability
Application Areas
Annulus Isolation
Isolate the annulus to prevent water influx, stop water production, and enhance oil and gas recovery, extending the life of your well.
Barrier Monitoring
Log pressure and temperature below a barrier for real-time or long-term verification. Data can be monitored live or sent to the surface.
Completion Repair
Repair old and new completions, including setting packers, leak testing, and straddle operations. Achieve cost savings compared to a full new completion.
Production Optimization
Prevent water influx, increase oil and gas production, and extend well lifespan. Isolate zones, retrofit gas lift, and optimize revenue through tailored solutions.
Temporary P&A
Interwell offers secure, efficient Temporary P&A solutions with advanced casing plugs, ensuring well integrity and compliance during well suspension and abandonment operations.
Well integrity
Re-establish well integrity, extend well lifespan, and increase revenue. Efficient, cost-effective solutions compared to new completions.