High Temperature High Expansion Bridge Plug
THEX - High Temperature High Expansion Bridge Plug
This product can be used in:
The Product
The THEX
The THEX is designed to pass through narrow wellbore restrictions and withstand pressures up to 5000 psi and temperatures up to 160 °C.
The innovative packer module includes packer backups that provide a tight radial barrier against the casing ID and enables the plug to withstand pressure up to 5000 psi and temperatures up to 160 °C. A slim design counters the risks associated with inflatable packers.
It's been tested at a differential pressure up to 345 bar (5000 psi) at temperatures up to 160 °C (320 °F) and is qualified in accordance with the ISO 14310:2008 international standard up to validation grade V0.
Technology
The THEX bridge plug can be used as a temporary or permanent barrier where there is a need for large expansion. The element and slips modules are designed to withstand bi-directional pressure, which allows the plug to be set in cross flow. The packer module allows the THEX to be used in high temperature environments.
Key Beneifts
- Can be run on slickline, e-line, coiled tubing and pipe
- It can be equalised and retrieved with standard GS in a single operation (no prong required)
- The centralising adapter kit ensures correct centralisation of the packer element during setting
- Slim design and large expansion allows for passage through narrow restrictions in the wellbore, and setting in comparatively large IDs
- The packer module enables the tool to run in high temperature environments
- Other sizes available on request
Download Product Sheet
Adaptability
Application Areas
Annulus Isolation
Isolate the annulus to prevent water influx, stop water production, and enhance oil and gas recovery, extending the life of your well.
Barrier Monitoring
Log pressure and temperature below a barrier for real-time or long-term verification. Data can be monitored live or sent to the surface.
Completion Repair
Repair old and new completions, including setting packers, leak testing, and straddle operations. Achieve cost savings compared to a full new completion.
Production Optimization
Prevent water influx, increase oil and gas production, and extend well lifespan. Isolate zones, retrofit gas lift, and optimize revenue through tailored solutions.
Temporary P&A
Interwell offers secure, efficient Temporary P&A solutions with advanced casing plugs, ensuring well integrity and compliance during well suspension and abandonment operations.
Well Integrity
Re-establish well integrity, extend well lifespan, and increase revenue. Efficient, cost-effective solutions compared to new completions.