CASE |
DATE |
PRODUCT |
Enhancing Integrity & Quality of Data While Reducing Risk By Installing MSAS (Master Surface Annulus Safety) & VR Sense |
July 26, 2024 |
|
MSWP & BVS: Interwell’s Single Run Solution to Confirm Tubing Integrity |
July 15, 2024 |
BARRIER VERIFICATION SYSTEM (BVS) |
Enhancing Efficiency in P&A: The Impact of Interwell's Integrated Punch & Plug Single Run Solution |
July 11, 2024 |
|
Customised 560-963 High Expansion, V0 Rated Straddle for Large Bore Production ID Brings Well Back Online |
July 11, 2024 |
Customised Straddle |
UK First for Interwell’s Iconic Digital Transponder (iDT) Acoustic Downhole Monitoring System |
June 24, 2024 |
Iconic Digital Transponder (iDT) |
PTC MSAS and VR Sense Installed Offshore Denmark |
May 13, 2024 |
PTC Master Surface Annulus Safety Valve (MSAS) |
Efficient Deepwater Upper Completion with Interwell’s IRSV Case Study |
December 20, 2023 |
Inter Remote Shatter Valve |
Intelligent Barrier Valve (IBV) Remotely opens After 1 Year to Resume Production from a Lower Producing Zone Case Study.pdf |
December 01, 2023 |
Intelligent Barrier Valve |
Re-establishing Production after Failed Gas Lift Valve |
October 30, 2023 |
Anchored Production Straddle |
CannSeal ZonalSeal Reinstates Production in Horizontal Oil Producer |
September 25, 2023 |
CannSeal ZonalSeal |
Intervention-Free Completion Installed with Shallow and Deep Set IRBV |
June 29, 2023 |
Inter Remote Bypass Valve |
Customised 252-350 Permenant Plug Provides non-Pyrotechnic Solution for Limited Rig-up Space |
June 07, 2023 |
Permenant Plug |
Efficient Intervention Less Completion Deployment Using IRBV |
May 18, 2023 |
Inter Remote Bypass Valve |
Optimised Gas Cavern Storage Recompletion |
April 14, 2023 |
High Expansion Retrievable Bridge Plug |
Successful Water Shut-Off Operations in Horizontal Wells using High Expansion Bridge Plugs |
April 14, 2023 |
High Expansion Retrievable Bridge Plug |
Non-Workover Solution for Damaged SVLN Bores 6 Years of Uninterrupted Production through Interwell IVC |
April 13, 2023 |
Insert Valve Carrier |
Epoxy Injection in Gravel-Pack to Shut Off Water Producing Zones and Extend Production Lifetime |
April 13, 2023 |
CannSeal IntegritySeal |
Restoring Integrity to an Unconventional Cement Packer Design |
April 13, 2023 |
CannSeal IntegritySeal |
Reducing Gas Production from a Lower Zone with a High Delta Pressure |
April 13, 2023 |
CannSeal ZonalSeal |
First Intelligent Barrier Valve and Inter Remote Shatter Valve Combination in Dual String Completion Optimised Rig Operations in Malaysia |
April 11, 2023 |
Intelligent Barrier Valve |
Optimisation of Casing and Completion Workover Using Glass Plug Technology Case Study |
March 01, 2023 |
Inter Remote Shatter Valve |
Isolate Extensive Leaks and Reinstate Gas Lift Functionality with Retrofitted Multi Run Straddle System |
February 13, 2023 |
Multi-Run Anchored Production Straddle |
Water Shut Off In Crossflow Conditions Using One of the World’s Shortest Retrievable Plugs |
January 06, 2023 |
Matrix Platform Retrievable Bridge Plug |
Optimised Completion Deployment and Well Start-up Utilising our Inter Removable Barrier Device Mechanical-Open |
October 20, 2022 |
Inter Removable Barrier Device - Mechanical Open |
Smart Plugs for Intervention Free Well Completion |
September 01, 2022 |
Inter Remote Bypass Valve |
A collaborative approach to maximise recovery and reduce intervention footprint |
March 11, 2022 |
Anchored Production Straddle |
Shallow and deep set Inter Remote Bypass Valve successfully operated in a single well |
January 27, 2022 |
Inter Remote Bypass Valve |
Optimized Intervention with Interwell's Glass barrier device |
January 17, 2022 |
Inter Removable Barrier Device - Pump Open |
First Inter Remote Shatter Valve in Asia Pacific Region Successfully Mitigating Risks in Workover Operations |
December 28, 2021 |
Inter Remote Shatter Valve |
Superior Gas Lift Straddle Solution in Collaboration with PTC |
October 15, 2021 |
Anchored Production Straddle |
Insert Valve Carrier with Slips |
October 12, 2021 |
Insert Valve Carrier |
Multi Product Application Delivers Reliabilities and Efficiencies to Subsea PA Campaign |
October 06, 2021 |
High Temperature High Expansion Bridge Plug |
RockSolid™ Barrier System is a Success |
September 15, 2021 |
RockSolid™ |
First in Indonesia, Zonal isolation with High Expansion HEX (Straddle) |
September 10, 2021 |
High Expansion Retrievable Bridge Plug |
First Multi Set Wireline Plug with IBV set as shallow well barrier |
August 24, 2021 |
Intelligent Barrier Valve |
World's first packer integrity remediation to re-establish annulus integrity using E-line Intervention |
August 13, 2021 |
Barrier Verification System |
Re-establishing Reservoir Isolation during Deepwater US GoM RLWI with the BVS |
June 28, 2021 |
Barrier Verification System |
Suspension Plugs run remotely on E-Line saves over four days Rig Time |
June 09, 2021 |
Medium Expansion Bridge Plug |
Electronic Setting Tool Enables Efficient P&A Campaign |
October 21, 2020 |
Electronic Setting Tool |
Optimized Completion with Interwell Shatter Glass barrier device |
October 21, 2020 |
Inter Remote Barrier Device Mechanical Open |
Intervention-less Completion |
October 21, 2020 |
Inter Remote Shatter Valve |
Inter Remote Shatter Valve (IRSV) remotely opened after 674 Days |
October 21, 2020 |
Inter Remote Shatter Valve |
Retrofitting IVC prevents expensive workover |
August 26, 2020 |
Insert Valve Carrier |
Wireless Gauge provides accurate real time downhole data for tubing evaluation and barrier verification |
May 27, 2020 |
Barrier Verification System |
Temporary P&A installation with 342-450 Permanent Plug |
April 07, 2020 |
Permanent Plug |
Interwell's Barrier Verification System successfully used for pre-P&A activity |
April 01, 2020 |
Barrier Verification System |
Pre-PA with Interwell's Intelligent Barrier Valve |
August 23, 2019 |
Intelligent Barrier Valve |
Intervention free Subsea Completion |
July 09, 2019 |
Inter Remote Bypass Valve |
Set Plug to STim Reservoir Zone with Acid |
June 18, 2018 |
High Pressure High Temperature Retrievable Bridge Plug |
Pump Open Sub CW 342-450 ME Thru Bore RBP |
May 30, 2018 |
Pump Open Sub |
Re-establish Gas Lift using APS to recover stuck valvet |
April 12, 2018 |
Standard Straddles |
Shut in Tool CW Interwell 356-450 Tubing Packer |
December 28, 2017 |
Shut In Tool |
Well Brought Back Online with APS & Screens |
May 23, 2017 |
Standard Straddles |
Significant cost savings with High Expansion solution |
April 07, 2017 |
High Expansion Retrievable Bridge Plug |
High Expansion Solution for Horizontal Well |
March 15, 2017 |
High Expansion Retrievable Bridge Plug |
Custom Multi-Run APS in North Sea |
February 07, 2017 |
Standard Straddles |
First Global Run of THEX |
January 13, 2017 |
High Temperature High Expansion Bridge Plug |
Bespoke IVC Systems in Australia |
October 18, 2016 |
Insert Valve Carrier |
EBS & Junk Extension saves 12 hours rig time |
October 18, 2016 |
Equalising Balldrop Sub |
BVS saves 14 months of workover time |
October 18, 2016 |
Barrier Verification System |
BVS first run in UK North Sea |
October 18, 2016 |
Barrier Verification System |
Modified HEX Tubing Packer with 3M Sand Screens |
July 22, 2016 |
High Expansion Retrievable Bridge Plug |
Six ME plugs for safe rig approach |
July 22, 2016 |
Medium Expansion Retrievable Bridge Plug |
Modified HPHT Set in Oil Based Mud |
July 22, 2016 |
High Pressure High Temperature Retrievable Bridge Plug |
Multi-Run Anchored Production Straddle (APS) with Polished Bore Receptacle (PBR) |
July 22, 2016 |
Standard Straddles |
Avoiding recompletion with a PBR Straddle |
July 21, 2016 |
Standard Straddles |
Reinstating well integrity with the Anchored Production Straddle |
May 20, 2016 |
Standard Straddles |
Deep-set HEX in GoM |
February 24, 2016 |
High Expansion Retrievable Bridge Plug |
VSS in Holland |
December 17, 2015 |
Velocity String Solutions |
Modified HEX solution in Australia |
December 17, 2015 |
High Expansio Retrievable Bridge Plug |
First run PP in Australia |
December 17, 2015 |
Permanent Plug |
First run POS in UK |
December 17, 2015 |
Pump Open Sub |
First Matrix Installation in North Sea |
December 17, 2015 |
Matrix Platform Retrievable Bridge Plug |
Client modified Cement Retainer |
December 17, 2015 |
Cement Retainer Assembly |
12 Hours Rigtime Saved with Equalising Balldrop Sub |
December 17, 2015 |
Equalising Balldrop-Sub |
First run IVC in Middle East |
December 14, 2015 |
SSV Straddles |
FAV Case Study |
November 17, 2015 |
Flow Activated Valve |
EJC-A Case Study |
November 17, 2015 |
Expandable Junk Catcher Add-On |
Modified HEX |
November 17, 2015 |
High Expansion Retrievable Bridge Plug |
HEX in the Middle East |
November 17, 2015 |
High Expansion Retrievable Bridge Plug |
IVC without use of existing safety lock profile |
November 17, 2015 |
SSV Straddles |
Restoring Production with HPHT |
September 15, 2015 |
HPHT Retrievable Bridge Plug |
BVS Case Study |
August 04, 2015 |
Barrier Verification System |
MSP Case Study |
August 04, 2015 |
Multi Setting Pulling Tool |
APS Gas Lift |
July 22, 2015 |
Standard Straddles |
VSS Case Study |
May 22, 2015 |
Velocity String Solutions |
Custom made 7” IVC run in damaged safety valve profile |
March 30, 2015 |
SSV Straddles |
2 7-8” ME Plug installed for the first time |
March 30, 2015 |
Medium Expansion Retrievable Bridge Plug |
Two Gauge Hangers with four Quartz Gauges |
March 29, 2015 |
High Expansion Gauge Hanger |
Successful introduction of our Expandable Junk Catcher (EJC) |
March 29, 2015 |
Expandable Junk Catcher |
ISO 14310 V-1 qualified ME Cement Retainer |
March 29, 2015 |
Cement Retainer Assembly |
First runs performed with the Expandable Junk Catcher add-on, EJC-A |
March 18, 2015 |
Expandable Junk Catcher Add-on |
MSP Case Study |
March 18, 2015 |
Multi Setting Pulling Tool |