CASE |
DATE |
PRODUCT |
Water Shut Off In Crossflow Conditions Using One of the World’s Shortest Retrievable Plugs |
January 06, 2023 |
Matrix Platform Retrievable Bridge Plug (MP) |
Optimised Completion Deployment and Well Start-up Utilising our Inter Removable Barrier Device Mechanical-Open |
October 20, 2022 |
Inter Removable Barrier Device - Mechanical Open |
Smart Plugs for Intervention Free Well Completion |
September 01, 2022 |
Inter Remote Bypass Valve |
A collaborative approach to maximise recovery and reduce intervention footprint |
March 11, 2022 |
Anchored Production Straddle |
Shallow and deep set Inter Remote Bypass Valve successfully operated in a single well |
January 27, 2022 |
Inter Remote Bypass Valve |
Optimized Intervention with Interwell's Glass barrier device |
January 17, 2022 |
Inter Removable Barrier Device - Pump Open |
First Inter Remote Shatter Valve in Asia Pacific Region Successfully Mitigating Risks in Workover Operations |
December 28, 2021 |
Inter Remote Shatter Valve |
Superior Gas Lift Straddle Solution in Collaboration with PTC |
October 15, 2021 |
Anchored Production Straddle |
Insert Valve Carrier with Slips |
October 12, 2021 |
Insert Valve Carrier |
Multi Product Application Delivers Reliabilities and Efficiencies to Subsea PA Campaign |
October 06, 2021 |
High Temperature High Expansion Bridge Plug |
RockSolid™ Barrier System is a Success |
September 15, 2021 |
Plug & Abandonment |
First in Indonesia, Zonal isolation with High Expansion HEX (Straddle) |
September 10, 2021 |
High Expansion Retrievable Bridge Plug |
First Multi Set Wireline Plug with IBV set as shallow well barrier |
August 24, 2021 |
Intelligent Barrier Valve |
World's first packer integrity remediation to re-establish annulus integrity using E-line Intervention |
August 13, 2021 |
Barrier Verification System |
Re-establishing Reservoir Isolation during Deepwater US GoM RLWI with the BVS |
June 28, 2021 |
Barrier Verification System |
Suspension Plugs run remotely on E-Line saves over four days Rig Time |
June 09, 2021 |
Medium Expansion Bridge Plug |
Electronic Setting Tool Enables Efficient P&A Campaign |
October 21, 2020 |
Electronic Setting Tool |
Optimized Completion with Interwell Shatter Glass barrier device |
October 21, 2020 |
Inter Remote Barrier Device Mechanical Open |
High Expansion Retrievable Bridge Plug (HEX) in Russia West Siberia |
October 21, 2020 |
High Expansion Retrievable Bridge Plug |
Intervention-less Completion |
October 21, 2020 |
Inter Remote Shatter Valve |
Inter Remote Shatter Valve (IRSV) remotely opened after 674 Days |
October 21, 2020 |
Inter Remote Shatter Valve |
Retrofitting IVC prevents expensive workover |
August 26, 2020 |
Insert Valve Carrier |
Wireless Gauge provides accurate real time downhole data for tubing evaluation and barrier verification |
May 27, 2020 |
Barrier Verification System |
Temporary P&A installation with 342-450 Permanent Plug |
April 07, 2020 |
Permanent Plug |
Interwell's Barrier Verification System successfully used for pre-P&A activity |
April 01, 2020 |
Barrier Verification System |
Pre-PA with Interwell's Intelligent Barrier Valve |
August 23, 2019 |
Intelligent Barrier Valve |
Case Study Intervention free Subsea Completion |
July 09, 2019 |
Inter Remote Bypass Valve |
Case Study Set Plug to STim Reservoir Zone with Acid |
June 18, 2018 |
High Pressure High Temperature Retrievable Bridge Plug |
Case Study Pump Open Sub CW 342-450 ME Thru Bore RBP |
May 30, 2018 |
Pump Open Sub |
Case Study Re-establish Gas Lift using APS to recover stuck valvet |
April 12, 2018 |
Standard Straddles |
Case Study Shut in Tool CW Interwell 356-450 Tubing Packer |
December 28, 2017 |
Shut In Tool |
Case Study Well Brought Back Online with APS & Screens |
May 23, 2017 |
Standard Straddles |
Case Study Significant cost savings with High Expansion solution |
April 07, 2017 |
High Expansion Retrievable Bridge Plug |
Case Study High Expansion Solution for Horizontal Well |
March 15, 2017 |
High Expansion Retrievable Bridge Plug |
Case Study Custom Multi-Run APS in North Sea |
February 07, 2017 |
Standard Straddles |
Case Study First Global Run of THEX |
January 13, 2017 |
High Temperature High Expansion Bridge Plug |
Case Study Bespoke IVC Systems in Australia |
October 18, 2016 |
Insert Valve Carrier |
Case Study EBS & Junk Extension saves 12 hours rig time |
October 18, 2016 |
Equalising Balldrop Sub |
Case Study BVS saves 14 months of workover time |
October 18, 2016 |
Barrier Verification System |
Case Study BVS first run in UK North Sea |
October 18, 2016 |
Barrier Verification System |
Modified HEX Tubing Packer with 3M Sand Screens |
July 22, 2016 |
High Expansion Retrievable Bridge Plug |
Case Study Six ME plugs for safe rig approach |
July 22, 2016 |
Medium Expansion Retrievable Bridge Plug |
Case Study Modified HPHT Set in Oil Based Mud |
July 22, 2016 |
High Pressure High Temperature Retrievable Bridge Plug |
Case Study Multi-Run Anchored Production Straddle (APS) with Polished Bore Receptacle (PBR) |
July 22, 2016 |
Standard Straddles |
Case Study Avoiding recompletion with a PBR Straddle |
July 21, 2016 |
Standard Straddles |
Case Study Reinstating well integrity with the Anchored Production Straddle |
May 20, 2016 |
Standard Straddles |
Deep-set HEX in GoM |
February 24, 2016 |
High Expansion Retrievable Bridge Plug |
Case Study VSS in Holland |
December 17, 2015 |
Velocity String Solutions |
Case Study Multi-run APS |
December 17, 2015 |
Standard Straddles |
Case Study Modified HEX solution in Australia |
December 17, 2015 |
www.interwell.com/high-expansion-retrievable-bridge-plug |
Case Study First run PP in Australia |
December 17, 2015 |
www.interwell.com/permanent-plug |
Case Study First run POS in UK |
December 17, 2015 |
www.interwell.com/pump-open-sub |
Case Study First Matrix Installation in North Sea |
December 17, 2015 |
www.interwell.com/matrix-platform-retrievable-bridge-plug |
Case Study Client modified Cement Retainer |
December 17, 2015 |
www.interwell.com/cement-retainer-assembly |
Case Study 12 Hours Rigtime Saved with Equalising Balldrop Sub |
December 17, 2015 |
www.interwell.com/equalising-balldrop-sub |
Case Study First run IVC in Middle East |
December 14, 2015 |
www.interwell.com/ssv-straddles |
Case Study FAV |
November 17, 2015 |
www.interwell.com/flow-activated-valve |
Case Study EJC-A |
November 17, 2015 |
www.interwell.com/expandable-junk-catcher-add-on |
Case Study application modified HEX |
November 17, 2015 |
www.interwell.com/high-expansion-retrievable-bridge-plug |
Case Study HEX in the Middle East |
November 17, 2015 |
www.interwell.com/high-expansion-retrievable-bridge-plug |
Case Study IVC without use of existing safety lock profile |
November 17, 2015 |
www.interwell.com/ssv-straddles |
Case Study Restoring Production with HPHT |
September 15, 2015 |
www.interwell.com/hpht-retrievable-bridge-plug |
Case Study BVS |
August 04, 2015 |
www.interwell.com/barrier-verification-system |
Case Study MSP May.2014 |
August 04, 2015 |
www.interwell.com/multi-setting-pulling-tool |
Case Study APS Gas-Lift |
July 22, 2015 |
www.interwell.com/standard-straddles |
Case Study VSS |
May 22, 2015 |
www.interwell.com/velocity-string-solutions |
Hex Plugs for new customer in Norway |
March 30, 2015 |
www.interwell.com/high-expansion-retrievable-bridge-plug |
Case Study Custom made 7” IVC run in damaged safety valve profile |
March 30, 2015 |
www.interwell.com/ssv-straddles |
Case Study 2 7-8” ME Plug installed for the first time |
March 30, 2015 |
http://www.interwell.com/medium-expansion-retrievable-bridge-plug |
Case Study Straddle installation in the Middle East Region |
March 30, 2015 |
www.interwell.com/straddle-solutions |
Case Study 350-700 High Expansion (HEX) Bridge Plug |
March 30, 2015 |
www.interwell.com/high-expansion-retrievable-bridge-plug |
Case Study 440-700 High Expansion (HEX) Straddle |
March 30, 2015 |
www.interwell.com/high-expansion-retrievable-bridge-plug |
Case Study Two Gauge Hangers with four Quartz Gauges |
March 29, 2015 |
www.interwell.com/high-expansion-gauge-hanger |
Case Study Successful introduction of our Expandable Junk Catcher (EJC) |
March 29, 2015 |
www.interwell.com/expandable-junk-catcher |
Case Study Two multi-run Straddles |
March 29, 2015 |
www.interwell.com/standard-straddles |
Case Study ISO 14310 V-1 qualified ME Cement Retainer |
March 29, 2015 |
http://www.interwell.com/cement-retainer-assembly |
Case Study First runs performed with the Expandable Junk Catcher add-on, EJC-A |
March 18, 2015 |
www.interwell.com/expandable-junk-catcher-add-on |
Case Study MSP |
March 18, 2015 |
http://www.interwell.com/multi-setting-pulling-tool |