Keep up-to-date with our news and events from around the world.

Case studies

CASE DATE PRODUCT PRODUCT CATEGORY
Superior Gas Lift Straddle Solution in Collaboration with PTC October 15, 2021 Superior Gas Lift Straddle Solution in Collaboration with PTC Anchored Production Straddle (APS)
High Expansion Bridge Plugs Set in GRE Tubing October 12, 2021 High Expansion Bridge Plugs Set In GRE Tubing Insert Valve Carrier (IVC)
Multi Product Application Delivers Reliabilities and Efficiencies to Subsea P&A Campaign October 06, 2021 Multi Product Application Delivers Reliabilities and Efficiencies to Subsea PA Campaign High Temperature High Expansion Bridge Plug (THEX)
RockSolid (TM) barrier system is a success September 15, 2021 RockSolid(TM) Barrier System is a Success Plug & Abandonment
First in Indonesia Zonal Isolation with High Expansion (HEX) Straddle September 10, 2021 First in Indonesia, Zonal isolation with High Expansion HEX (Straddle) High Expansion Retrievable Bridge Plug (HEX)
First Multi Set Wireline Plug with IBV set as shallow well barrier August 24, 2021 First Multi Set Wireline Plug with IBV set as shallow well barrier Intelligent Barrier Valve (IBV)
World's first packer integrity remediation to re-establish annulus integrity using E-line Intervention August 13, 2021 World's first packer integrity remediation to re-establish annulus integrity using E-line Intervention Barrier Verification System (BVS)
Re-establishing Reservoir Isolation during Deepwater US GoM RLWI with the BVS June 28, 2021 Re-establishing Reservoir Isolation during Deepwater US GoM RLWI with the BVS.pdf Barrier Verification System (BVS)
Suspension plugs run remotely on E-Line saves over four days Rig Time June 09, 2021 Suspension Plugs run remotely on E-Line saves over four days Rig Time.pdf Medium Expansion Bridge Plug (ME)
Electronic Setting Tool Enables Efficient P&A Campaign October 21, 2020 Electronic Setting Tool Enables Efficient P&A Campaign Electronic Setting Tool (EST)
Optimized Completion with Interwell Shatter Glass barrier device October 21, 2020 Optimized Completion with Interwell Shatter Glass barrier device Inter Remote Barrier Device Mechanical Open (IRBV-MO)
High Expansion Retrievable Bridge Plug (HEX) in Russia, West Siberia October 21, 2020 High Expansion Retrievable Bridge Plug (HEX) in Russia West Siberia High Expansion Retrievable Bridge Plug (HEX)
Intervention - less Completion October 21, 2020 Intervention-less Completion Inter Remote Shatter Valve
Inter Remote Shatter Valve (IRSV) remotely opened after 674 Days October 21, 2020 Inter Remote Shatter Valve (IRSV) remotely opened after 674 Days Inter Remote Shatter Valve
Retrofitting Insert Valve Carrier prevents expensive workover August 26, 2020 Retrofitting IVC prevents expensive workover Insert Valve Carrier (IVC)
Wireless Gauge provides accurate real time downhole data for tubing evaluation and barrier verification May 27, 2020 Wireless Gauge provides accurate real time downhole data for tubing evaluation and barrier verification Barrier Verification System (BVS)
Temporary P&A installation with 342-450 Permanent Plug April 07, 2020 Temporary P&A installation with 342-450 Permanent Plug Permanent Plug (PP)
Interwell's Barrier Verification System successfully used for pre-P&A activity April 01, 2020 Interwell's Barrier Verification System successfully used for pre-P&A activity Barrier Verification System (BVS)
Pre-P&A with Interwell's Intelligent Barrier Valve August 23, 2019 Case Study Pre-PA with Interwell's Intelligent Barrier Valve Intelligent Barrier Valve (IBV)
Intervention free Subsea Completion July 09, 2019 Case Study Intervention free Subsea Completion www.interwell.com/inter-remote-bypass-valve/category766.html
Set Plug to Stim Reservoir Zone with Acid June 18, 2018 Case Study Set Plug to STim Reservoir Zone with Acid High-Pressure High-Temperature Retrievable Bridge Plug (HPHT)
Pump Open Sub C/W 342-450 ME Thru Bore RBP May 30, 2018 Case Study Pump Open Sub CW 342-450 ME Thru Bore RBP Pump Open Sub (POS)
Re-Establish Gas Lift using APS to recover stuck in valve April 12, 2018 Case Study Re-establish Gas Lift using APS to recover stuck valvet www.interwell.com/standard-straddles
Shut in Tool C/W Interwell 356-450 Tubing Packer December 28, 2017 Case Study Shut in Tool CW Interwell 356-450 Tubing Packer www.interwell.com/shut-in-tool
Well Brought Back Online with APS & Screens May 23, 2017 Case Study Well Brought Back Online with APS & Screens www.interwell.com/standard-straddles
Significant Cost Savings with High Expansion Solution April 07, 2017 Case Study Significant cost savings with High Expansion solution www.interwell.com/high-expansion-retrievable-bridge-plug
High Expansion Solution for Horizontal Well March 15, 2017 Case Study High Expansion Solution for Horizontal Well www.interwell.com/high-expansion-retrievable-bridge-plug
Custom Multi - Run APS in North Sea February 07, 2017 Case Study Custom Multi-Run APS in North Sea www.interwell.com/standard-straddles
First Global Run of THEX January 13, 2017 Case Study First Global Run of THEX www.interwell.com/high-temperature-high-expansion-bridge-plug
Bespoke IVC Systems in Australia October 18, 2016 Case Study Bespoke IVC Systems in Australia www.interwell.com/ssv-straddles
EBS & Junk Extension saves 12 hours rig time October 18, 2016 Case Study EBS & Junk Extension saves 12 hours rig time www.interwell.com/equalising-balldrop-sub
BVS saves 14 months of workover time October 18, 2016 Case Study BVS saves 14 months of workover time www.interwell.com/barrier-verification-system
BVS first run in UK North Sea October 18, 2016 Case Study BVS first run in UK North Sea www.interwell.com/barrier-verification-system
Modified HEX Tubing Packer with 3M™ Ceramic Sand Screens July 22, 2016 Modified HEX Tubing Packer with 3M Sand Screens High Expansion Retrievable Bridge Plug
Six ME plugs for safe rig approach July 22, 2016 Case Study Six ME plugs for safe rig approach www.interwell.com/medium-expansion-retrievable-bridge-plug
Modified HPHT Set in Oil Based Mud July 22, 2016 Case Study Modified HPHT Set in Oil Based Mud www.interwell.com/hpht-retrievable-bridge-plug
Multi-Run Anchored Production Straddle (APS) with Polished Bore Receptacle (PBR) July 22, 2016 Case Study Multi-Run Anchored Production Straddle (APS) with Polished Bore Receptacle (PBR) www.interwell.com/standard-straddles
Avoiding recompletion with a PBR Straddle July 21, 2016 Case Study Avoiding recompletion with a PBR Straddle www.interwell.com/standard-straddles
Reinstating well integrity with the Anchored Production Straddle May 20, 2016 Case Study Reinstating well integrity with the Anchored Production Straddle www.interwell.com/standard-straddles
Deep-set HEX in Gulf of Mexico February 24, 2016 Case Study Deep-set HEX in GoM www.interwell.com/high-expansion-retrievable-bridge-plug
Velocity String Solution in Holland December 17, 2015 Case Study VSS in Holland www.interwell.com/velocity-string-solutions
Multi-run APS December 17, 2015 Case Study Multi-run APS www.interwell.com/standard-straddles
Modified HEX solution in Australia December 17, 2015 Case Study Modified HEX solution in Australia www.interwell.com/high-expansion-retrievable-bridge-plug
First run Permanent Plug in Australia December 17, 2015 Case Study First run PP in Australia www.interwell.com/permanent-plug
First run Pump Open Sub in UK December 17, 2015 Case Study First run POS in UK www.interwell.com/pump-open-sub
First Matrix Installation in North Sea December 17, 2015 Case Study First Matrix Installation in North Sea www.interwell.com/matrix-platform-retrievable-bridge-plug
Client modified Cement Retainer December 17, 2015 Case Study Client modified Cement Retainer www.interwell.com/cement-retainer-assembly
12 Hours Rigtime Saved with Equalising Balldrop Sub December 17, 2015 Case Study 12 Hours Rigtime Saved with Equalising Balldrop Sub www.interwell.com/equalising-balldrop-sub
First run IVC in Middle East December 14, 2015 Case Study First run IVC in Middle East www.interwell.com/ssv-straddles
Flow Activated Valve (FAV) November 17, 2015 Case Study FAV www.interwell.com/flow-activated-valve
Expandable Junk Catcher Add-on (EJC-A) November 17, 2015 Case Study EJC-A www.interwell.com/expandable-junk-catcher-add-on
Application modified HEX November 17, 2015 Case Study application modified HEX www.interwell.com/high-expansion-retrievable-bridge-plug
High Expansion Bridge Plug in The Middle East November 17, 2015 Case Study HEX in the Middle East www.interwell.com/high-expansion-retrievable-bridge-plug
Insert Valve Carrier without use of existing safety lock profile November 17, 2015 Case Study IVC without use of existing safety lock profile www.interwell.com/ssv-straddles
Restoring production with HPHT September 15, 2015 Case Study Restoring Production with HPHT www.interwell.com/hpht-retrievable-bridge-plug
Barrier Verification System (BVS) August 04, 2015 Case Study BVS www.interwell.com/barrier-verification-system
Multi Setting Pulling (MSP) Tool August 04, 2015 Case Study MSP May.2014 www.interwell.com/multi-setting-pulling-tool
Anchored Production Straddle (APS) for Gas-Lift July 22, 2015 Case Study APS Gas-Lift www.interwell.com/standard-straddles
Velocity String Solution (VSS) May 22, 2015 Case Study VSS www.interwell.com/velocity-string-solutions
Hex Plugs for new customer in Norway March 30, 2015 Hex Plugs for new customer in Norway www.interwell.com/high-expansion-retrievable-bridge-plug
Custom made 7" IVC run in damaged safety valve profile March 30, 2015 Case Study Custom made 7” IVC run in damaged safety valve profile www.interwell.com/ssv-straddles
2 7/8" ME Plug installed for the first time March 30, 2015 Case Study 2 7-8” ME Plug installed for the first time http://www.interwell.com/medium-expansion-retrievable-bridge-plug
Straddle installation in the Middle East Region March 30, 2015 Case Study Straddle installation in the Middle East Region www.interwell.com/straddle-solutions
350-700 High Expansion (HEX) Bridge Plug March 30, 2015 Case Study 350-700 High Expansion (HEX) Bridge Plug www.interwell.com/high-expansion-retrievable-bridge-plug
440-700 High Expansion (HEX) Straddle March 30, 2015 Case Study 440-700 High Expansion (HEX) Straddle www.interwell.com/high-expansion-retrievable-bridge-plug
Seven Straddles in one well March 29, 2015 Case Study Seven Straddles in one well www.interwell.com/standard-straddles
Two Gauge Hangers with four Interwell Quartz Gauges, pre-installed in 5 1/2" drill pipe March 29, 2015 Case Study Two Gauge Hangers with four Quartz Gauges www.interwell.com/high-expansion-gauge-hanger
Successful introduction of our Expandable Junk Catcher (EJC) March 29, 2015 Case Study Successful introduction of our Expandable Junk Catcher (EJC) www.interwell.com/expandable-junk-catcher
Two multi-run Straddles March 29, 2015 Case Study Two multi-run Straddles www.interwell.com/standard-straddles
ISO 14310 V-1 qualified ME Cement Retainer March 29, 2015 Case Study ISO 14310 V-1 qualified ME Cement Retainer http://www.interwell.com/cement-retainer-assembly
First runs performed with the Expandable Junk Catcher add-on (EJC-A) March 18, 2015 Case Study First runs performed with the Expandable Junk Catcher add-on, EJC-A www.interwell.com/expandable-junk-catcher-add-on
Multi Setting Pulling (MSP) Tool March 18, 2015 Case Study MSP http://www.interwell.com/multi-setting-pulling-tool
TOP